International standards become useful through the everyday work of preparing, reviewing and explaining a cost plan. A carefully designed pilot can show what that requires in Bhutan.

My MSc dissertation investigated readiness for RICS standards in Bhutan’s construction sector, with a focus on quantity surveying and cost management. The practitioner survey and expert consultation pointed towards a phased approach: build capacity, adapt the working methods to local conditions and learn through selected projects.

This was a research recommendation from the study period. It should be read as a proposal for discussion, rather than a statement that a national implementation programme is in place.

Begin with a common basis

Teams need to understand what they are measuring and reporting before they can compare their results. RICS NRM provides measurement rules and guidance for cost management. ICMS provides an international framework for classifying and reporting construction costs.

These frameworks serve related purposes at different levels. A Bhutanese application would need to explain how local rate sources, project information and reporting requirements fit within the chosen structure. Training should use worked local examples so that a common format also produces a common understanding.

Choose a pilot that can teach

The expert consultation favoured beginning with mid-sized government projects. Such projects were proposed as a manageable setting in which to test the approach and adapt it through practice. Selecting a pilot would still require the agreement and resources of the relevant project participants.

My suggested pilot would begin with an agreed scope, a documented cost plan and a clear record of assumptions. The team would track revisions and approved changes through delivery, then compare the final account with the relevant estimate on a consistent scope basis.

Success should be assessed through practical questions: can another professional follow the estimate, can the client understand the allowances, and can the team explain the causes of cost movement?

Build local teaching capacity

The dissertation’s expert consultation supported a train-the-trainer approach and structured mentorship. The aim is to develop people who can apply the methods, review the work and teach colleagues using examples from local practice.

A short course can introduce a framework. Repeated use, feedback and access to experienced reviewers are needed to turn that introduction into reliable working habits.

Evaluate before extending

A pilot should produce evidence about the effort involved, the training gaps and the usefulness of the resulting information. It can also reveal where templates or guidance need to change before wider use.

The dissertation assessed readiness and gathered professional views. It did not run an implementation trial or demonstrate that adopting a particular standard would reduce overruns. That next step calls for a measured test, with outcomes reviewed openly.

For Bhutan, a useful ambition is a cost planning process that clients can understand, practitioners can apply consistently and future projects can learn from.

Lungten Tshering
Principal, Omeya Insights

Writing on cost planning, estimation, valuation and professional practice in Bhutan’s built environment.